DRILLING AND PRODUCTION SUPPORT

BRACED CAISSON WELL PROTECTOR168’-0” WATER DEPTH
 Braced Caissons can be installed in 20’ to 180’ feet of water
 This structure can facilitate up to 3 wells

 The braced caisson can hold a larger deck than the caisson with a second level deck and sump deck in shallow water
 One leg of the braced caisson will be a caisson and the two battered legs are piles
 Installation of this structure is performed by a jack up boat or small derrick barge
 Braced caissons have a small boat landing and pile guide