About our projects

Our Projects

.

8,000BPD EXTENDED WELL TEST FOR OZA-4

CLIENT:  – DECKLAR PETROLEUM LTD/ MILLENNIUM OIL AND GAS LTD

Date – August 2021                                          Status – Ongoing

DECRIPTION

As part of its field development efforts and in JV with Millennium Oil and Gas for its OZA field in OML-11, KrisQUEST was contacted for EPCIC & Operations and Maintenance of an 8,000BPD Extended well test/ early crude oil production facility.

The facility which is complete with surface facilities, process utilities, storage, metering and export facilities was installed and commissioned in record time and on budget.

 

OZA-1 TCP | DST | SURFACE WELL TEST

Client – DECKLAR PETROLEUM LTD/ MILLENNIUM OIL AND GAS LTD

Date – August 2021                       Status – Ongoing

KrisQUEST in collaboration with its partner Sparkoil Energy were engaged by DECKLAR PETROLEUM RESOURCES to execute the Oza-1 well test upon completion of well drilling operations. The project which lasted circa 60 days was delivered on scheduled without LTI.

 

.

MAXIMUM EFFICIENCY RATE TEST ON STUBB CREEK WELLS

Client – SAVANNAH ENERGY / SIPEC JOT

Date – May 2021          Status – Ongoing

As per DPR regulation, Oil & Gas operators in Nigeria are expected to conduct periodic Maximum Efficiency Rate (MER) testing of their producing wells. In December 2021, SAVANNAH ENERGY, in keeping with DPR requirements, contacted KrisQUEST Energy Services Ltd to conduct the MER on its 6 producing wells in its Stubb Creek Field in OML-14.

We modelled, designed and deployed a truck-mounted mobile well test package to conduct the Maximum Efficiency Rate exercise in record time and on budget.

.ERIEMU-11 GAS EXTENDED FLOW TEST

Client – HERITAGE ENERGY OPERATIONAL SERVICES LTD

Date – August 2018                  Status – Completed

As part of its brownfield optimization efforts in its Eriemu field, HEOSL the operator of OML-30 subcontracted KrisQUEST to conduct an 8 months long Gas extended flow test on its Eriemu-11 well.

Produced condensate was tied-back to the process facility at the Eriemu flow station while the produced gas was scrubbed and distribution as gas lift to optimize production from aging wells

10,000 BOPD CRUDE PROCESS FACILITY 

Client – NETWORK EXPLORATION AND PRODUCTION LTD

Date – 2015       Status – Completed

KrisQUEST in collaboration with JAG Logistics Limited (Alberta, Canada) Engineered, Procured, Constructed, Installed, Commissioned, Operated and Maintained a 10,000BOPD Crude Process Facility for NETWORK exploration and production at its Qua Iboe field in OML-13.

The EPCIC phase of  the work was delivered in record time and on budget.

 

Projects

we are leveraging on strategic<br /> partnerships, OEM’s arrangement and utilization of engineering software and digital<br /> tools.

ENGINEERING TOOLS<br />  ASPEN HYSYS Process Modelling and Simulation<br />  Promax Chemical Process Simulator<br />  Fathom Pipe Flow Analysis<br />  Bentley SACS Offshore Structure Design and Analysis<br />  Cadworx Plant Professional<br />  Autodesk Plant Professional

 Flaretot Flare Radiation and Dispersion Analysis<br />  Petroleum Expert Oil Field Management<br />  Fluid Flow Hydraulics<br />  Oil Field Manager<br />  OLGA<br />  Pipesim<br />  PV-Elite<br />  VMGSim<br />  KrisQuest Specialised Hydraulic and Sizing Software